{"id":276,"date":"2023-09-15T16:03:32","date_gmt":"2023-09-15T08:03:32","guid":{"rendered":"http:\/\/acrel-electric.de\/?p=276"},"modified":"2023-10-31T14:23:51","modified_gmt":"2023-10-31T06:23:51","slug":"anwendung-von-acrel-mehrkreiszahlern-im-deutschen-rechenzentrum","status":"publish","type":"post","link":"https:\/\/www.acrel-electric.de\/en\/anwendung-von-acrel-mehrkreiszahlern-im-deutschen-rechenzentrum\/","title":{"rendered":"Application of Acrel multi-circuit meters in the German data center"},"content":{"rendered":"<p class=\"has-medium-font-size\">Data center is a place which gathers a large number of servers, storage devices, network equipment and supporting UPS, precision air conditioning and other IT equipment, is to realize the centralized processing, storage, transmission, exchange and centralized management of data and information service platform.<\/p>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-medium-font-size\">Data center power supply quality directly affects the safe operation of IT equipment, so the data center column header tank outlet and inlet line of power supply monitoring are very important, in addition, as the global available energy and reduced energy costs increase, how much more economical and efficient use of energy has become a duty-bound responsibility related to enterprises.<\/p>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-large-font-size\"><strong>Project overview<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\">According to the monitoring equipment requirements of the data center array cabinet, our company developed the AMC16-FAK48 data center monitoring device to realize the electrical parameters of multiple outgoing lines and the switching status of the incoming and outgoing lines, and achieve comprehensive monitoring. InnovIT AG is the largest data center manufacturer in Germany. This meter, which can monitor up to 48 single-phase AC outgoing circuits, is used together with Acrel&#039;s AKH-0.66-K-\u03a610 split-core current transformer to meet customers&#039; requirements for monitoring 39 circuits.<\/p>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-large-font-size\"><strong>Features<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\">AMC16Z is a multi-circuit AC current meter for DIN rail mounting that was specially developed to meet the requirements of increasingly precise power distribution in data centers. It is suitable for careful, all-round self-monitoring of final distribution systems.<\/p>\n\n\n\n<p class=\"has-medium-font-size\">\u25cf Specially developed for power management of servers in data centers<\/p>\n\n\n\n<p class=\"has-medium-font-size\">\u25cf A+B independent 24 circuits\uff0848 in total\uff09<\/p>\n\n\n\n<p class=\"has-medium-font-size\">\u25cf U, I, P, Q, S, PF, kWh, kvarh<\/p>\n\n\n\n<p class=\"has-medium-font-size\">\u25cf 2nd to 31st harmonic<\/p>\n\n\n\n<p class=\"has-medium-font-size\">\u25cf kWh class 0.5<\/p>\n\n\n\n<p class=\"has-medium-font-size\">\u25cf DIN35mm<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"280\" src=\"http:\/\/acrel-electric.de\/wp-content\/uploads\/2023\/09\/1-1.webp\" alt=\"\" class=\"wp-image-279\" style=\"width:840px;height:280px\" srcset=\"https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/1-1.webp 500w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/1-1-300x168.webp 300w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/1-1-18x10.webp 18w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-large-font-size\"><strong>structure<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"745\" src=\"http:\/\/acrel-electric.de\/wp-content\/uploads\/2023\/09\/\u7ed3\u6784.webp\" alt=\"\" class=\"wp-image-277\" srcset=\"https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u7ed3\u6784.webp 800w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u7ed3\u6784-300x279.webp 300w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u7ed3\u6784-768x715.webp 768w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u7ed3\u6784-13x12.webp 13w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-large-font-size\"><strong>Photos on site<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"767\" height=\"1024\" src=\"http:\/\/acrel-electric.de\/wp-content\/uploads\/2023\/09\/\u73b0\u573a\u7167\u7247-767x1024.webp\" alt=\"\" class=\"wp-image-278\" srcset=\"https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u73b0\u573a\u7167\u7247-767x1024.webp 767w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u73b0\u573a\u7167\u7247-225x300.webp 225w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u73b0\u573a\u7167\u7247-768x1025.webp 768w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u73b0\u573a\u7167\u7247-9x12.webp 9w, https:\/\/lingjuimg.com\/wp-content\/uploads\/ankerui\/2023\/09\/\u73b0\u573a\u7167\u7247.webp 800w\" sizes=\"auto, (max-width: 767px) 100vw, 767px\" \/><\/figure>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-large-font-size\"><strong>Summary<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\">With the rapid development of data centers, the problem of energy consumption in data centers is becoming more and more prominent. Energy management, power supply and distribution of data centers have become important issues. An efficient and reliable power distribution system for data centers is an effective way to improve the power consumption efficiency of data centers and reduce the energy consumption of equipment. In order to realize the energy saving of data center, you must first achieve accurate monitoring of each power consumer, the load circuit and data center very much, the traditional measuring instruments can not meet the cost, size, installation, construction and other aspects of the requirements, so you must use applies to data center centralized monitoring requirement of the multi-loop monitoring device.<\/p>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-medium-font-size\">The AMC16M is specially designed for array cabinets in the data center. The application of this type of product has been thoroughly studied, and it is better than other systems in terms of function, performance, availability and economics.<\/p>","protected":false},"excerpt":{"rendered":"<p>Rechenzentrum ist ein Ort, der eine gro\u00dfe Anzahl von Servern, Speicherger\u00e4ten, Netzwerkger\u00e4ten und unterst\u00fctzende USV, Pr\u00e4zisionsklimatisierung und andere IT-Ger\u00e4te versammelt, ist die zentralisierte Verarbeitung, Speicherung, \u00dcbertragung, Austausch und zentralisierte Verwaltung von Daten und Informationen Service-Plattform zu realisieren. Data Center Stromversorgung Qualit\u00e4t wirkt sich direkt auf den sicheren Betrieb der IT-Ger\u00e4te, so dass das Rechenzentrum Spalte [&hellip;]<\/p>","protected":false},"author":1,"featured_media":457,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"class_list":["post-276","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-europa"],"_links":{"self":[{"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/posts\/276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/comments?post=276"}],"version-history":[{"count":4,"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/posts\/276\/revisions"}],"predecessor-version":[{"id":657,"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/posts\/276\/revisions\/657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/media\/457"}],"wp:attachment":[{"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/media?parent=276"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/categories?post=276"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.acrel-electric.de\/en\/wp-json\/wp\/v2\/tags?post=276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}